NTPC surges with its Karsada plant reaching complete technology potential

NTPC surges with its Karsada plant reaching complete technology potential

by admin- Friday, March 22nd, 2019 04:15:31 PM

NTPC is currently trading at Rs. 131.00, up by means of 1.70 factors or 1.31% from its preceding ultimate of Rs. 129.30 at the BSE.

The scrip opened at Rs. A hundred thirty.00 and has touched a excessive and occasional of Rs. 132.40 and Rs. 130.00 respectively. So a ways 166685 shares have been traded at the counter.

The BSE organization ‘A’ stock of face fee Rs. 10 has touched a 52 week excessive of Rs. 149.Eighty two on 18-Apr-2018 and a fifty two week low of Rs. 106.71 on thirteen-Feb-2019.

Last one week excessive and low of the scrip stood at Rs. 137.25 and Rs. 127.28 respectively. The modern-day marketplace cap of the employer is Rs. 127936.63 crore.

The promoters maintaining inside the agency stood at fifty eight.Ninety three%, at the same time as Institutions and Non-Institutions held 37.Seventy seven% and three.30% respectively.

NTPC’s two hundred kilo watt (kW) waste-to-energy plant in Karsada has performed complete generation potential. The plant is placed in Karsada at Varanasi, Uttar Pradesh (UP). The undertaking is in step with the authorities’s Swachh Bharat Mission, promoting a healthful environment through right waste utilisation.

News Updates